 |
 |
|
|
|
|
Funding How will the Mid County Parkway be funded?
The preliminary design and environmental studies for the Mid County Parkway are being funded through the western Riverside County Transportation Uniform Mitigation Fee or TUMF.The project is not fully funded, but Final Engineering Design, right-of-way acquisition and construction costs are anticipated to be funded by a combination of Measure A, Riverside County’s 1/2˘ sales tax for transportation; TUMF fees; and state and federal dollars. RCTC is working closely with Caltrans and the Federal Highway Administration so that the proposed roadway will meet state and federal standards and be eligible for state and federal funding.
|
|
|
|
|
 |
 |
 |
The Mid County Parkway is a project of Riverside County Transportation Commission (RCTC).
4080 Lemon Street,
3rd Floor, P.O. Box 12008 · Riverside, CA 92502-2208 · (951)
787-7141 · www.rctc.org |
|
 |
|
 |
 |